  In the early days of nuclear power,the united states made money on it. But today opponents have so complicated its development that no nuclear plants have been ordered or built here in 12 years.

  The greatest fear of nuclear power opponents has always been a reactor meltdown . Today, the chances of a meltdown that would threaten U.S.public health are very little.But to even further reduce the possibility,engineers are testing new reactors that rely not on human judgment to shut them down but on the laws of nature.Now General Electric is already building two advanced reactors in Japan.But dont expect them even on U.S.shores unless things change in Washington.

  The procedure for licensing nuclear power plants is a bad dream.Any time during,or even after,construction,an objection by any group or individual can bring everything to a halt while the matter is investigated or taken to court.Meanwhile,the builder must add nice-but-necesary improvements,some of which force him to knock down walls and start over.In every case when a plant has been opposed,the Nuclear Regulation Commission has ultimately granted a license to construct ends up abandoning the plant anyway.

  A case in point is the Shoreham plant on New Yorks Long Island.Shoreham was a virtual twin to the Millstone plant in Connecticet,both ordered in the mid-60s.Millstone,complete for $101 million,has been generating electricity for two decades.Shoreham, however,was singled out by antinulear activists who,by sending in endless protests,drove the cost $5 billion and delayed its use for many years.

  Shoreham finally won its operation license.But the plant has never produced a watt power.Governor Mario Cuomo,an opponent of a Shoreham start-up, used his power to force New Yorks publicutilities commission to accept the following settlement: the power company could pass the cost of Shoreham along to its consumers only if it agreed not to operate the plant.Today,a perfectly good facility,capable of servicing hundreds of thousands of homes,sits rusting.

  1.The authors attitude towards the development of nuclear power it _____.

  a.negative

  b.neutral

  c.positive

  d.questioning

  2.What has made the procedure for licensing nuclear power plants a bad dream?

  a.The inefficiency of the nuclear regulation commission

  b.The enormous cost of comstruction and operation

  c.The length of time it takes to make investigation.

  d.The objection of the opponents of nuclear power.

  3.It can be inferred from paragraph 2 that ______.

  a.there are not enough safety measures in the u.s for running new nuclear power plants.

  b.it is not technical difficulties that prevent the building of nuclear power plants in the u.s.

  c.there are already more nuclear power plants than necessary in the U.S.

  d.the American government will not allow Japanese nuclear reactors to be installed in the u.s.

  4.Governor Mario Cuomos chief intention in porposing the settlement was to _______.

  a.stop the Shoreham plant from going into operation

  b.urge the Shoreham company to further increase its power supply

  c.permit the Shoreham plant to operation under certain conditions

  d.help the power company to solve its financial porblems

  答案:cdba

  

  In the early days of nuclear power,the united states made money on it. But today opponents have so complicated its development that no nuclear plants have been ordered or built here in 12 years.

  The greatest fear of nuclear power opponents has always been a reactor meltdown . Today, the chances of a meltdown that would threaten U.S.public health are very little.But to even further reduce the possibility,engineers are testing new reactors that rely not on human judgment to shut them down but on the laws of nature.Now General Electric is already building two advanced reactors in Japan.But dont expect them even on U.S.shores unless things change in Washington.

  The procedure for licensing nuclear power plants is a bad dream.Any time during,or even after,construction,an objection by any group or individual can bring everything to a halt while the matter is investigated or taken to court.Meanwhile,the builder must add nice-but-necesary improvements,some of which force him to knock down walls and start over.In every case when a plant has been opposed,the Nuclear Regulation Commission has ultimately granted a license to construct ends up abandoning the plant anyway.

  A case in point is the Shoreham plant on New Yorks Long Island.Shoreham was a virtual twin to the Millstone plant in Connecticet,both ordered in the mid-60s.Millstone,complete for $101 million,has been generating electricity for two decades.Shoreham, however,was singled out by antinulear activists who,by sending in endless protests,drove the cost $5 billion and delayed its use for many years.

  Shoreham finally won its operation license.But the plant has never produced a watt power.Governor Mario Cuomo,an opponent of a Shoreham start-up, used his power to force New Yorks publicutilities commission to accept the following settlement: the power company could pass the cost of Shoreham along to its consumers only if it agreed not to operate the plant.Today,a perfectly good facility,capable of servicing hundreds of thousands of homes,sits rusting.

  1.The authors attitude towards the development of nuclear power it _____.

  a.negative

  b.neutral

  c.positive

  d.questioning

  2.What has made the procedure for licensing nuclear power plants a bad dream?

  a.The inefficiency of the nuclear regulation commission

  b.The enormous cost of comstruction and operation

  c.The length of time it takes to make investigation.

  d.The objection of the opponents of nuclear power.

  3.It can be inferred from paragraph 2 that ______.

  a.there are not enough safety measures in the u.s for running new nuclear power plants.

  b.it is not technical difficulties that prevent the building of nuclear power plants in the u.s.

  c.there are already more nuclear power plants than necessary in the U.S.

  d.the American government will not allow Japanese nuclear reactors to be installed in the u.s.

  4.Governor Mario Cuomos chief intention in porposing the settlement was to _______.

  a.stop the Shoreham plant from going into operation

  b.urge the Shoreham company to further increase its power supply

  c.permit the Shoreham plant to operation under certain conditions

  d.help the power company to solve its financial porblems

  答案:cdba

  

主站蜘蛛池模板: 涂层测厚仪_光泽度仪_uv能量计_紫外辐照计_太阳膜测试仪_透光率仪-林上科技 | 无菌实验室规划装修设计-一体化实验室承包-北京洁净净化工程建设施工-北京航天科恩实验室装备工程技术有限公司 | 北京翻译公司_同传翻译_字幕翻译_合同翻译_英语陪同翻译_影视翻译_翻译盖章-译铭信息 | 帽子厂家_帽子工厂_帽子定做_义乌帽厂_帽厂_制帽厂_帽子厂_浙江高普制帽厂 | 辊道窑炉,辊道窑炉厂家-山东艾希尔 | 甲级防雷检测仪-乙级防雷检测仪厂家-上海胜绪电气有限公司 | 苏州伊诺尔拆除公司_专业酒店厂房拆除_商场学校拆除_办公楼房屋拆除_家工装拆除拆旧 | 防爆电机生产厂家,YBK3电动机,YBX3系列防爆电机,YBX4节防爆电机--河南省南洋防爆电机有限公司 | 南京租车,南京汽车租赁,南京包车,南京会议租车-南京七熹租车 | 北京发电车出租-发电机租赁公司-柴油发电机厂家 - 北京明旺盛安机电设备有限公司 | 阴离子聚丙烯酰胺价格_PAM_高分子聚丙烯酰胺厂家-河南泰航净水材料有限公司 | 数控专用机床,专用机床,自动线,组合机床,动力头,自动化加工生产线,江苏海鑫机床有限公司 | 西安耀程造价培训机构_工程预算实训_广联达实作实操培训 | 杭州ROHS检测仪-XRF测试仪价格-百科 | 泰来华顿液氮罐,美国MVE液氮罐,自增压液氮罐,定制液氮生物容器,进口杜瓦瓶-上海京灿精密机械有限公司 | 岛津二手液相色谱仪,岛津10A液相,安捷伦二手液相,安捷伦1100液相-杭州森尼欧科学仪器有限公司 | 工业制氮机_psa制氮机厂家-宏骁智能装备科技江苏有限公司 | 成都装修公司-成都装修设计公司推荐-成都朗煜装饰公司 | 薪动-人力资源公司-灵活用工薪资代发-费用结算-残保金优化-北京秒付科技有限公司 | 最新电影-好看的电视剧大全-朝夕电影网 | 工业车间焊接-整体|集中除尘设备-激光|等离子切割机配套除尘-粉尘烟尘净化治理厂家-山东美蓝环保科技有限公司 | 纳米涂料品牌 防雾抗污纳米陶瓷涂料厂家_虹瓷科技 | 湿地保护| 江苏农村商业银行招聘网_2024江苏农商行考试指南_江苏农商行校园招聘 | 铁艺,仿竹,竹节,护栏,围栏,篱笆,栅栏,栏杆,护栏网,网围栏,厂家 - 河北稳重金属丝网制品有限公司 山东太阳能路灯厂家-庭院灯生产厂家-济南晟启灯饰有限公司 | 有声小说,听书,听小说资源库-听世界网| 苏商学院官网 - 江苏地区唯一一家企业家自办的前瞻型、实操型商学院 | 深圳快餐店设计-餐饮设计公司-餐饮空间品牌全案设计-深圳市勤蜂装饰工程 | 一体化净水器_一体化净水设备_一体化水处理设备-江苏旭浩鑫环保科技有限公司 | 砍排机-锯骨机-冻肉切丁机-熟肉切片机-预制菜生产线一站式服务厂商 - 广州市祥九瑞盈机械设备有限公司 | 食品质构分析仪-氧化诱导分析仪-瞬态法导热系数仪|热冰百科 | 宜兴市恺瑞德环保科技有限公司| 塑料造粒机「厂家直销」-莱州鑫瑞迪机械有限公司 | 餐饮加盟网_特色餐饮加盟店_餐饮连锁店加盟| 超声波清洗机_大型超声波清洗机_工业超声波清洗设备-洁盟清洗设备 | 首页-瓜尔胶系列-化工单体系列-油田压裂助剂-瓜尔胶厂家-山东广浦生物科技有限公司 | 成都热收缩包装机_袖口式膜包机_高速塑封机价格_全自动封切机器_大型套膜机厂家 | 能耗监测系统-节能监测系统-能源管理系统-三水智能化 | 不干胶标签-不干胶贴纸-不干胶标签定制-不干胶标签印刷厂-弗雷曼纸业(苏州)有限公司 | 高防护蠕动泵-多通道灌装系统-高防护蠕动泵-www.bjhuiyufluid.com慧宇伟业(北京)流体设备有限公司 | 制丸机,小型中药制丸机,全自动制丸机价格-甘肃恒跃制药设备有限公司 |